Background
Tarbotton Land & Civil worked with the Christchurch WSP team to transform 13 hectares of arable farmland on the west side of Tinwald, Ashburton into a prestigious 66 lot residential subdivision. The subdivision includes 18 lifestyle lots which range from 5,500 sqm to 3,500 sqm and 48 lots with an average size of 775 sqm. This subdivision features 1 stormwater retention pond, 600 meters of roadings, 1.5 km of kerb and channel, 600 meters of asphalted footpaths, 1 roundabout and 5 right of ways, along with grass swales down the roadside and right of ways. Tarbotton Land & Civil installed the water reticulation system, sewer connections, power and fibre to all lots, along with a large sewer pump station.
Services used on this project
Cawton Grove drew on our residential subdivision siteworks, site earthworks and shaping and road metal and drainage metal supply.
Cawton Grove was delivered by our Ashburton civil construction team. We are always on the lookout for good operators, so have a look at our current civil construction jobs.
Get your project Done Right
The road to success is never straightforward. That's why we explore every angle of a project upfront to ensure it runs smoothly and efficiently. Because for us, being the best isn’t about getting it done fastest, or cheapest. It’s about getting it Done Right for you.